EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (678)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
-
Elevator balance
-
Stick Grips
-
Rudder Cable Return Kit
-
Aileron Servo
-
Aileron Cables
-
Elevator Push Pull Tube
-
Cockpit
-
Flap Control Assembly
-
Elevator push pull tube
-
Brake cylinders and...
-
Control assembly
-
Right Aileron
-
Right Aileron
-
Left Aileron
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Flaps and Ailerons
-
Flaps
-
Flaps
-
Flaps
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Jan 27, 2022
Control assembly
- (5 hours)
Category: Controls
Completed inventory of finish kit hardware. Stapled to board. Assembled rudder pedals and rudder pedal control assembly. Assembled control stick torque tube and control rod.
Controls assemebly.jpg
Rudder pedal assembly 1.jpg
Rudder pedal initial assembly.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.